Commercial premises renovation in Barcelona
The licence decides the project, not the other way round. We check what your activity requires before anyone draws a single wall.
- 48 h
- Fixed written quote within 48 h
- 0 €
- Free site visit
- 1
- How we work
- ★ 5,0
- Google · 13
Start here
The activity licence comes first
On a commercial fit-out the licence decides the project, not the budget. A straightforward scheme runs 6 to 12 weeks on site, but licence processing runs in parallel and frequently takes longer than the building work, which is why it is started first. The cost gap between activities is enormous: a retail unit needing accessible entry, an accessible WC and fire signage is a fraction of a bar, which needs extraction ducted to roof level, grease separation, specific ventilation and health authority sign-off. What has to be verified before anyone draws a wall is whether your activity is permitted at that address at all, and whether the premises has a transferable existing licence. We check that before quoting, and the quote is fixed in writing 48 hours after the survey.
| Use | The item that decides feasibility | Relative cost |
|---|---|---|
| Retail | Step-free entry and an accessible WC | Lowest |
| Office | Fire escape routes and emergency lighting | Low to moderate |
| Clinic or salon | Plumbing, ventilation and sector-specific rules | Moderate |
| Food and beverage | Extraction duct to roof level, grease separation | Highest by a wide margin |
What has to be verified before designing
- Fire protection: exit routes, signage, extinguishers, fire-rated materials
- Noise limits and permitted opening hours for the activity
- Whether the premises has a valid previous licence that can be transferred
Cost and time
What a fit-out involves
Typical scope
- Strip-out and licensed waste disposal
- Electrical installation with three-phase supply where required
- Shopfront, signage and accessible entry
- Finishes and lighting suited to the commercial use
For non-resident owners and tenants
Fitting out a Barcelona unit from abroad
Two kinds of client come to us with a commercial unit and no permanent presence in the city: the investor who has bought a local to let, and the operator opening a Barcelona branch from another country. The questions are different, but both turn on the same three documents.
The unit sits in a residential building, and that building has a say
A ground-floor local is your private property, but the building around it belongs to the comunidad de propietarios. Anything you attach to or pass through communal elements — an extraction duct running up the rear façade or the light well to roof level, a new opening in the façade, a shopfront that changes the building’s appearance, an air conditioning condenser — needs the association’s authorisation, voted at a junta. Some buildings go further: the statutes registered against the property may expressly prohibit particular activities, most commonly bars and anything generating noise or smells. That prohibition is enforceable and it is checked before you sign a lease, not after. Note the direction of the money here — you fund your own fit-out entirely, and no derrama is involved, but you cannot proceed without the vote.
The extraction duct is the deal-breaker for food and drink
A restaurant or bar needs its extraction taken to above roof level, and in a Barcelona building that means a duct crossing several floors of communal space. If the unit has no existing duct, you need both a physical route and the junta’s consent to use it. This single item has ended more Barcelona restaurant projects than any budget problem, and it is entirely knowable in advance. We establish it in the first visit, before any design work is paid for.
Landlord or tenant: who pays for what
If you are letting the unit, the lease should state clearly which works are the landlord’s, which are the tenant’s, and what condition the premises must be returned in. Spanish commercial leases are freely negotiated on this point, so silence is expensive: reinstatement at the end of a tenancy can cost as much as the original fit-out. If you are the tenant, establish before signing whether the activity licence exists and is transferable — buying a business with a valid licence in place is worth a great deal more than the same premises without one, and the difference is not visible from photographs.
How we run it without you in Barcelona
- A feasibility check on the address and the activity before design fees are spent
- The technical documentation prepared and filed by us, with the reference sent to you
- Weekly photo reports and a written record of every cost-affecting decision
- Access, delivery and working hours coordinated with the building administrator
- Nothing touching a communal element started before the authorisation is in writing
Frequently asked
What clients ask most
It varies widely by activity. A retail unit is far cheaper than a bar requiring roof-level extraction and grease separation. We quote after the survey and after checking what the licence demands, and the price is fixed in writing within 48 hours.
Yes. We prepare the technical documentation and file the application. Requirements depend on the activity and the district, and we verify them before any design work begins.
No. It depends on the planning permissions at that address, on whether extraction can be ducted to roof level, on the building’s statutes — which sometimes prohibit the activity outright — and on noise limits. This is checked before signing a lease, not after.
For work inside the unit, no. For anything touching communal elements — an extraction duct up the façade, a new opening, a condenser, a shopfront changing the building’s appearance — yes, by vote at a junta. You still pay for your own works; what you need from the association is authorisation.
6 to 12 weeks on site for a straightforward scheme. Licence processing runs in parallel and frequently takes longer, so it is started first.
Next step
Shall we talk about your project?
Free site visit in Barcelona and the metropolitan area. Fixed written quote within 48 hours, no obligation.
Before you decide
Practical guides
Real prices, permits and how a project runs when you live abroad. So you can compare quotes knowing what you are looking at.
Areas
Where we work
Other services
We also do
Blog
What we learn on site
Real housing problems in Barcelona, explained by the people who fix them.
Renovating to let
Renovating to live in and renovating to let are different projects. What is an indulgence in your own home is a recurring maintenance cost in a rental.
Realistic timelines
Almost every overrun we see was decided before the first wall came down. The programme is not broken on site — it is broken at the ordering stage.
Costly mistakes
None of these mistakes has anything to do with taste. Every one of them is about the order in which things were done.
Clients
What clients say after their renovation
Rated 5.0 from 14 Google reviews. All real, from real projects.
★★★★★
“Doy un 10 la verdad con el servicio que me han prestado en una reforma de un piso en Barcelona capital, gente muy seria y responsable, gracias.”
Araks SahakyanJuly 2026
★★★★★
“Quedé encantada con la atención y la calidad del trabajo. Se nota que cuidan los detalles y cumplen con lo que prometen.”
Ana RiveraApril 2026
★★★★★
“Servicio muy profesional. Me explicaron todo con claridad y el trabajo quedó perfecto.”
Ana AlemanMarch 2026
★★★★★
“Si estas buscando profesionales responsables para hacer tu reforma, es el lugar indicado. Especializados en reformas integrales con la mejor atención personalizada. 100% recomendados.”
Daniel GarganoFebruary 2026
★★★★★
“Muy buen trabajo, ha realizado un trabajo muy profesional, ha cumplido en plazo y en calidad.”
Francisco PiñeirosAugust 2025
★★★★★
“Muy buenos profesionales, con excelente resultado.”
Esther DiezJune 2026
Shall we talk about your project?
Free technical visit in Barcelona and the metropolitan area. Fixed written quote within 48 hours.
+34 615 78 93 41· Carrer de la Diputació, 189, Local 2 · 08011 Barcelona