Practical guide · Organisation

Living at home during the works

Living in the flat while it is renovated is possible — but it has rules. When it makes sense, how it is sequenced, and what it will cost you extra.

48 h
Fixed written quote within 48 h
0 €
Free site visit
4
On this page
★ 5,0
Google · 13

Short answer

Can you live at home during the renovation?

Yes, provided the job is phased and one habitable zone with a working bathroom is kept alive throughout. It is not advisable during a full renovation that replaces all the installations: water and power go down across the whole flat for stretches of weeks, and dust reaches everywhere regardless of protection. Two bathrooms make staying home genuinely comfortable — one is renovated while the other keeps working; with a single bathroom that phase needs a very short agreed timescale and a plan B for showers. The trade-off is money and time: phasing repeats protection, crew mobilisation and cleaning at every stage, adding roughly 10–15% to the cost and several weeks to the total.

Yes — if the work is phased and one habitable zone with a working bathroom always remains. It is not advisable during a full renovation with complete replacement of installations: weeks without water, intermittent power and dust everywhere make it very hard.

When phasing makes sense

  • There is no alternative accommodation, or temporary rent would eat the budget
  • The work splits into separable zones: bathrooms first, then kitchen, then bedrooms
  • You prefer to spread the payments over time
  • There are two bathrooms: one is renovated while the other keeps working

When it does NOT make sense

When all installations are being replaced: water and power cuts affect the whole flat at once, and splitting the job multiplies both the total time and the fixed cost of every crew entry and exit. If you live abroad and the flat is empty — always do it in one go.

Sequence

In what order are the phases done?

The order is not arbitrary — the installations and the dependencies between zones dictate it.

Recommended order

  • Phase 1 — wet zones: bathroom(s) and kitchen. They carry most of the pipework and condition daily life the most
  • Phase 2 — living room and layout: partitions, day-zone flooring, internal joinery
  • Phase 3 — bedrooms: done in pairs, sleeping in the finished ones
  • Always: finished zones sealed off with plastic screens and a daily cleaning routine agreed in advance

The hidden cost of phasing

Every phase has a start-up and a close-down: protection, crew mobilisation, final cleaning. Added up, a phased renovation costs roughly 10–15% more than the same job done in one go — and takes longer in total.

Daily life

What is day-to-day life like with works at home?

Percussion noise from the morning, dust that gets through any protection, and trades arriving first thing. With small children, remote work or pets, it needs serious planning.

What genuinely helps

  • Agreed noise windows: percussion work only in fixed hours
  • One inviolable clean room: door closed, floor protected
  • A field kitchen: microwave, portable hob and fridge in the clean zone
  • A weekly schedule so you know which trades come and what gets cut off

Frequently asked

Common questions

Not advisable: full replacement of installations leaves the flat without water and power in stretches for weeks. If there is no alternative, it is planned in phases with a guaranteed habitable zone.

Around 10–15% more than the same job done at once: every phase repeats protection, mobilisation and cleaning. In exchange you spread the payments and keep living at home.

With the wet zones — bathrooms and kitchen. They concentrate most of the installations and condition daily life the most. Bedrooms are left for last.

Sealed plastic screens at the openings, floor protection, dust extraction on the tools that allow it, and an agreed daily clean. It reduces the problem a lot; eliminating it entirely is impossible.

With two, it is reasonable: one is renovated while the other works. With a single bathroom, that phase needs a very short agreed timescale — and a plan B for showers.

Next step

Want a figure for your own project?

Free site visit in Barcelona and the metropolitan area. Fixed written quote within 48 hours, no obligation.

Clients

What clients say after their renovation

Read all reviews on Google →

Rated 5.0 from 14 Google reviews. All real, from real projects.

  • ★★★★★

    “Doy un 10 la verdad con el servicio que me han prestado en una reforma de un piso en Barcelona capital, gente muy seria y responsable, gracias.”

    Araks SahakyanJuly 2026

  • ★★★★★

    “Quedé encantada con la atención y la calidad del trabajo. Se nota que cuidan los detalles y cumplen con lo que prometen.”

    Ana RiveraApril 2026

  • ★★★★★

    “Servicio muy profesional. Me explicaron todo con claridad y el trabajo quedó perfecto.”

    Ana AlemanMarch 2026

  • ★★★★★

    “Si estas buscando profesionales responsables para hacer tu reforma, es el lugar indicado. Especializados en reformas integrales con la mejor atención personalizada. 100% recomendados.”

    Daniel GarganoFebruary 2026

  • ★★★★★

    “Muy buen trabajo, ha realizado un trabajo muy profesional, ha cumplido en plazo y en calidad.”

    Francisco PiñeirosAugust 2025

  • ★★★★★

    “Muy buenos profesionales, con excelente resultado.”

    Esther DiezJune 2026