Running costs · BarcelonaFree site visit

Energy efficiency renovation

Your bill does not fall because you changed the boiler. It falls when the building stops losing heat, and that happens in the envelope.

48 h
Fixed written quote within 48 h
0 €
Free site visit
1
How we work
★ 5,0
Google · 13

Where to start

The order that actually works

The order that works is envelope first, equipment second: external windows with a thermal break and low-emissivity glass, then façade insulation, then the blind boxes, then the roof if you are on the top floor — and only then the heating and cooling system, sized against the reduced demand. Doing it the other way round means efficiently heating a flat that leaks heat, and it forces you to buy equipment that is bigger, dearer and more expensive to run. Where the work forms part of a wider renovation it is priced inside it, from €780/m² over 10–14 weeks; the envelope items alone are a two to four week job. The one step almost everyone skips is ventilation, and skipping it produces mould within months.

WorkEffect on demandNeeds owners association consentTypical time on site
External windows, thermal break, low-e glassHighestYes — the façade is communal, appearance is controlled2–5 days
Internal façade insulationHighNo, it is inside your flat1–2 weeks
Insulating the blind boxesHigh for the costNo1–2 days
Roof insulation, top floorHigh if you are under the roofYes, the roof is communalVaries
Efficient heating and coolingMedium — after the envelopeYes if an external unit goes on the façade2–4 days
Ventilation with heat recoveryPrevents damage rather than savingNoWith a full renovation

Ventilation

The part almost nobody plans for

An older property ventilates itself through gaps. Fit airtight windows and that ventilation disappears, and condensation appears where there was none.

How it is solved

  • Trickle vents in the frames, the simplest option
  • Mechanical extraction in bathroom and kitchen, where the vapour is produced
  • Balanced ventilation with heat recovery on full renovations

For non-resident owners

Where the flat ends and the building begins

Energy work is where an overseas owner most often discovers that the flat is not entirely theirs to improve: the envelope, the very thing that decides the bill, is largely communal.

The façade is communal, the inside face is yours

External wall insulation is better because it wraps the building and removes thermal bridges, but it is rarely available to you alone: the façade belongs to the comunidad de propietarios, the owners association, and altering it is decided at the junta, the owners meeting. On a catalogued building it may not be authorised at all. What you can do alone is insulate the inside face and the blind boxes and improve the glazing — with the caveat that street-facing frames affect the façade, so the profile and glazing bars can be prescribed. Ask the administrador de fincas what the building has already agreed before ordering anything.

A building-wide programme is funded by a derrama

Where the whole building insulates or replaces the roof, the cost is met by a derrama — a one-off levy on top of the ordinary monthly charge, divided by coeficiente de participación, the ownership share written into your title deed, and it is not optional. The upside for a non-resident is real: a communal programme delivers the external insulation you cannot buy on your own, at a share of the cost, and usually qualifies for the larger grants. You can vote by proxy in writing, which for an owner abroad is the habit worth establishing with the administrator.

Grants are paid on paperwork, and the paperwork comes first

Rehabilitation grant schemes for energy work exist in Catalonia, and the award normally depends on demonstrating an improvement in the energy rating: a certificate before, a certificate after, with an itemised quote and a technical project in between. What catches people out is the order of operations — start the works before the file is registered and you can disqualify spend that would otherwise have counted. Amounts change with the scheme in force, so we promise no figure.

The certificate is not a formality if you let or sell

The certificado de eficiencia energética must appear in the listing and in the contract. It is separate from the cédula d’habitabilitat, the habitability certificate, which governs whether the flat can legally be let at all and is issued against ventilation, ceiling height and a complete bathroom. The two interact: dropping a suspended ceiling to run ventilation ducts can take head height below the minimum, a problem discovered at renewal rather than at handover, so we check the remaining clearance before specifying it.

What to ask for when you cannot inspect the work yourself

  • Photographs of the insulation in place before the boards close it up — afterwards nobody can verify it
  • Confirmation in writing that the blind boxes were insulated, the item most often skipped
  • The ventilation strategy stated explicitly, not assumed
  • Energy certificates before and after: the evidence for a grant and the number in your future listing
  • Written junta approval where anything communal is touched, obtained before materials are ordered

Frequently asked

What clients ask most

Replacing external windows and insulating the façade. The boiler or the air conditioning come after, not before.

External performs better, but internal is what is viable in most Barcelona flats.

Because the flat stopped ventilating through gaps, so vapour now condenses on cold surfaces. It is designed for from the start, not fixed afterwards.

There are rehabilitation grant schemes, and we prepare the file they are awarded on. The amount depends on the scheme in force.

It depends on the starting point. In a 1970s flat with no insulation, working on windows and façade reduces demand substantially. We quantify it with energy certificates before and after.

Next step

Shall we talk about your project?

Free site visit in Barcelona and the metropolitan area. Fixed written quote within 48 hours, no obligation.

Before you decide

Practical guides

See all guides →

Real prices, permits and how a project runs when you live abroad. So you can compare quotes knowing what you are looking at.

Clients

What clients say after their renovation

Read all reviews on Google →

Rated 5.0 from 14 Google reviews. All real, from real projects.

  • ★★★★★

    “Doy un 10 la verdad con el servicio que me han prestado en una reforma de un piso en Barcelona capital, gente muy seria y responsable, gracias.”

    Araks SahakyanJuly 2026

  • ★★★★★

    “Quedé encantada con la atención y la calidad del trabajo. Se nota que cuidan los detalles y cumplen con lo que prometen.”

    Ana RiveraApril 2026

  • ★★★★★

    “Servicio muy profesional. Me explicaron todo con claridad y el trabajo quedó perfecto.”

    Ana AlemanMarch 2026

  • ★★★★★

    “Si estas buscando profesionales responsables para hacer tu reforma, es el lugar indicado. Especializados en reformas integrales con la mejor atención personalizada. 100% recomendados.”

    Daniel GarganoFebruary 2026

  • ★★★★★

    “Muy buen trabajo, ha realizado un trabajo muy profesional, ha cumplido en plazo y en calidad.”

    Francisco PiñeirosAugust 2025

  • ★★★★★

    “Muy buenos profesionales, con excelente resultado.”

    Esther DiezJune 2026

Shall we talk about your project?

Free technical visit in Barcelona and the metropolitan area. Fixed written quote within 48 hours.

+34 615 78 93 41· Carrer de la Diputació, 189, Local 2 · 08011 Barcelona

WhatsApp