Short answer

What exactly is a derrama?

A derrama is a one-off levy the owners association charges to fund work the monthly service charge does not cover, split by your coeficiente de participación — the percentage share written into your deeds, not an equal split. For scale: a full communal staircase refurbishment runs €15,000 to €35,000, repainting it from €6,000, and a light-well repair from €8,000. Your bill is that total times your percentage.

The comunidad de propietarios — the owners association that every Spanish block of flats has by law — is what raises it. It is not optional in the way many overseas owners assume: it is how buildings in Spain pay for anything substantial.

When one gets raised

  • Façade repair or renovation, the most common and usually the largest
  • Roof or terrace waterproofing, typically after leaks have appeared
  • Lift installation, replacement or modernisation
  • Repairs required by the ITE, the periodic inspection older buildings must pass
  • Replacement of communal pipework, electrical risers or the entry system
  • Legal costs, or a shortfall in the reserve fund

How it differs from the monthly charge

The monthly cuota covers running costs and a statutory contribution to the reserve fund. A derrama is a separate, extraordinary charge for capital work, paid in one instalment or spread over several months by agreement.

Work that typically triggers a derramaIndicative cost of the jobHow it is splitCan you vote against and not pay?
Full communal staircase refurbishment€15,000–35,000By your coeficiente in the deedsNo, once a surveyor certifies it as necessary
Repainting the entrance hall and stairsfrom €6,000By coeficienteIt is an improvement, so it depends on the majority reached
Light-well (patio de luces) repairfrom €8,000By coeficiente unless the statutes say otherwiseNo, if there is any risk of falling material
Communal wall and ceiling finishesfrom €4,500By coeficienteDepends on conservation versus improvement
LED lighting in communal areasfrom €1,800By coeficienteAn improvement, usually approved on running-cost savings
Communal flooringfrom €5,000By coeficienteNo, where safety is involved
Letterboxes and entry systemfrom €2,200By coeficienteAn improvement

Your share

How is my share calculated?

By your coeficiente de participación, a percentage attached to your flat and recorded in the deeds. If you have never read the figure, it is on the first page of your escritura.

What determines the amount you pay

  • The participation coefficient of your flat
  • Whether the estatutos, the building’s own rules, set a different split for particular elements
  • Whether the work affects only some owners, such as one staircase of several
  • How much sits in the fondo de reserva, the statutory reserve fund, which reduces the levy

The ground floor and the lift

Ground-floor flats and commercial units with no lift access are sometimes exempt from lift costs, but only if the estatutos say so explicitly. Where the rules are silent, they pay like everyone else. It is the most argued-about item in Barcelona general meetings, and it turns on a document rather than on fairness.

What this means for a foreign owner

Ask the building manager for your coefficient once and keep it. It decides your exposure to every project the building ever proposes, and you can work it out before the vote rather than after the bill.

The vote

What majority is needed, and can I refuse?

The majority required depends on the type of work, and for some categories there is effectively no vote at all.

The general rules

  • Necessary conservation and safety works: obligatory, and the meeting decides how, not whether
  • Accessibility works such as installing a lift: a reduced majority, reflecting the legal priority given to accessibility
  • Non-essential improvements: a qualified majority, and owners who vote against may be exempt above a defined cost threshold
  • Altering communal elements or the building’s constitutive title: unanimity

The crucial distinction

If a technician certifies that the façade risks material falling into the street, the work is legally necessary and voting against it neither exempts you nor stops the project. Objecting is then a conversation about the contractor and the price, not about whether to do it.

If you genuinely cannot attend

You can vote by written proxy, and for overseas owners this is the normal route. Give it to someone who will actually read the papers, and ask for the quotes in advance rather than deciding on the day. An owner who is simply absent is, in most circumstances, counted as agreeing with the majority.

Buying and selling

Who pays if the flat changes hands?

The single most common source of post-completion disputes in Spanish property, and entirely avoidable with two documents read before signing.

What to obtain before you buy

  • The certificate confirming the seller is up to date with community payments
  • Minutes of the last two general meetings, where approved and pending works appear
  • The current balance of the reserve fund
  • Whether the building has a valid ITE and what the result was
  • Confirmation of any approved works that have not yet started

The expensive mistake

Buying without reading the minutes. A façade project approved eight months ago and not yet started can mean a levy of several thousand euros arriving shortly after completion.

If you are buying from abroad

Ask your solicitor explicitly for the minutes and the ITE result rather than assuming they are in the standard pack, and have the contract state which party bears any levy approved before completion. One sentence prevents the entire dispute.

Frequently asked

Common questions

A one-off levy charged by the owners association to fund work the monthly service charge does not cover, typically façade repair, roof waterproofing, lift works or repairs required after a technical inspection.

By the participation coefficient recorded in your title deeds, as a percentage of the whole building. It is not split equally between owners and not strictly by floor area, so you can calculate your exposure before any vote.

Not if the work is necessary for the conservation or safety of the building. Those works are obligatory even for owners who voted against. For non-essential improvements there can be an exemption depending on the cost and on the building’s own rules.

As a general rule, whoever owns the flat when each instalment falls due. However, the meeting resolution and the sale contract can both say otherwise, so it should be stated explicitly in writing at the point of sale to avoid a dispute afterwards.

The minutes of the last two general meetings, the certificate that community payments are up to date, the reserve fund balance and the technical inspection result. Approved but unstarted works appear in the minutes and nowhere else.

Next step

Want a figure for your own project?

Free site visit in Barcelona and the metropolitan area. Fixed written quote within 48 hours, no obligation.

Clients

What clients say after their renovation

Read all reviews on Google →

Rated 5.0 from 14 Google reviews. All real, from real projects.

  • ★★★★★

    “Doy un 10 la verdad con el servicio que me han prestado en una reforma de un piso en Barcelona capital, gente muy seria y responsable, gracias.”

    Araks SahakyanJuly 2026

  • ★★★★★

    “Quedé encantada con la atención y la calidad del trabajo. Se nota que cuidan los detalles y cumplen con lo que prometen.”

    Ana RiveraApril 2026

  • ★★★★★

    “Servicio muy profesional. Me explicaron todo con claridad y el trabajo quedó perfecto.”

    Ana AlemanMarch 2026

  • ★★★★★

    “Si estas buscando profesionales responsables para hacer tu reforma, es el lugar indicado. Especializados en reformas integrales con la mejor atención personalizada. 100% recomendados.”

    Daniel GarganoFebruary 2026

  • ★★★★★

    “Muy buen trabajo, ha realizado un trabajo muy profesional, ha cumplido en plazo y en calidad.”

    Francisco PiñeirosAugust 2025

  • ★★★★★

    “Muy buenos profesionales, con excelente resultado.”

    Esther DiezJune 2026

Want a figure for your own project?

Free site visit and a fixed written quote within 48 hours.

+34 615 78 93 41· Carrer de la Diputació, 189, Local 2 · 08011 Barcelona

WhatsApp