Short answer
Can you live at home during the work?
In a partial renovation, usually yes. In a full renovation with new wiring and plumbing throughout, no — and staying is not automatically cheaper, because working around an occupied home stretches a 10–14 week programme and every extra week is charged. A bathroom takes 10–18 working days and is liveable only if there is a second one; a kitchen takes 12–25 days with a temporary arrangement for cooking. If the flat has one bathroom and you are renovating it, moving out for two weeks is the cheaper decision, not the softer one.
| Type of work | Time on site | Can you stay? | The condition that decides it |
|---|---|---|---|
| Bathroom renovation | 10–18 working days | Only with a second bathroom | No second bathroom means no water and no toilet for days |
| Kitchen renovation | 12–25 working days | Yes, with a temporary hob and sink | Made-to-measure units take 4–8 weeks to arrive: order before demolition |
| Painting and flooring room by room | Days per room | Yes | Furniture has to move ahead of the work, not with it |
| Window replacement | One or two windows a day | Yes | The flat is open to the street while each unit is out |
| Full rewire and replumb | 10–14 weeks | No | Prolonged power and water disconnection, plus dust in every room |
| Demolition of partitions | 2–4 days | No | Dust travels through the whole flat regardless of screens |
| Staying anyway | Adds weeks | Costs money | Protection, daily clearing and restricted hours are charged as work |
In partial renovations, almost always. In a full renovation with new services throughout, not in any reasonable sense of the word.
You can stay for
- A bathroom renovation when there is a second bathroom available
- A kitchen renovation, with a temporary arrangement for cooking and washing up
- Painting and floor replacement done room by room
- External joinery, replaced window by window
You cannot stay for
- A full renovation with new electrical and plumbing installations
- Any work involving prolonged water or power disconnection
- Demolition of partitions throughout the property
- Work on the only bathroom in the home
Real cost
Staying is not automatically cheaper
Working in an occupied home lengthens the programme and raises the cost of execution. The comparison that matters is between two complete scenarios, not between rent and zero.
What staying adds
- Daily protection of furniture and unaffected areas
- Working in phases rather than in parallel: more weeks on site
- Daily cleaning rather than a single clean at the end
- Restricted hours where there are small children or someone working from home
The sum worth doing
If the job goes from 8 to 12 weeks because the property is occupied, compare the cost of those four extra weeks against what temporary accommodation would have cost. On a full renovation the rental usually wins, and it wins more clearly the longer the job is. On a single bathroom it almost never does.
If you stay
How to make it bearable
Dust
Zipped plastic barriers at the openings, not loose sheeting and tape. Extraction connected directly to cutting tools. Construction dust penetrates everything if the seal is not done properly, and it is the complaint that arrives first and loudest.
Children and pets
The work zone closed off with controlled access, tools collected at the end of each day, and advance warning of the days with heavy noise. With pets, coordinate arrivals and deliveries so nothing escapes through a door left open — this happens more often than anyone expects, and it is entirely preventable.
Supply cuts
These are notified in advance and grouped together to reduce the number of affected days. It is worth having somewhere arranged to shower on the days the water is off, rather than discovering the problem that morning.
What is most underestimated
Continuous noise. Not the occasional hammer drill, but eight hours a day of background sound. For anyone working from home this is usually the real reason people end up moving out halfway through, having initially been certain they would manage.
Second homes and remote owners
The version where nobody lives there at all
For an owner who is not in Spain, the empty property is the easy case — and it is worth understanding why, because it changes what you should be asking for.
What an empty flat allows
- Trades working in parallel instead of sequentially, which compresses the programme substantially
- One clean at the end rather than daily clearing
- Full-day noisy work within permitted hours instead of working around a household
- Deliveries and waste removal without coordinating around anyone
What replaces your presence
Keys held under a written protocol, staged photographs at agreed points, and a single named contact rather than a rotating cast. The technical visit produces a fixed quote before anything begins, so the absence of an owner on site does not become an opening for the scope to drift.
If it is a holiday flat you use in summer
Plan the work for the months you are not there and count backwards from the date you want it usable, allowing for permit time and for the August slowdown. The most common mistake in this situation is starting in June and expecting to use the property in August.
The middle case
A tenant in place, or a family member staying, is the hardest scenario of all — it carries every constraint of an occupied property and none of the flexibility of an owner who can make decisions on the spot. If the flat is let, it is almost always better to time the work between tenancies.
Frequently asked
Common questions
Not in any reasonable way. A full renovation means renewing the services, with prolonged water and power cuts and demolition throughout the property. For partial renovations staying is usually perfectly viable.
Not necessarily. Working in an occupied home means phasing the trades, protecting daily and cleaning every evening, all of which lengthens the programme. Compare those extra weeks against the cost of temporary accommodation before deciding.
With zipped plastic barriers at doorways and extraction connected directly to cutting tools. Loose sheeting fixed with tape does not hold, and the dust ends up throughout the property.
It depends on the scope, but the cuts are grouped to reduce the number of affected days and are always notified in advance. On a bathroom renovation it is typically two or three specific days.
This is the most underestimated problem. The difficulty is not occasional noise but eight hours a day of it. If you work from home daily, it is worth seriously considering moving out for the noisiest weeks.
Next step
Want a figure for your own project?
Free site visit in Barcelona and the metropolitan area. Fixed written quote within 48 hours, no obligation.
More articles
Keep reading
Breakfast bar
It is the first thing people ask for when opening up a kitchen, and the first thing that gets built wrong. Usually by two centimetres too many in height or twenty too few in circulation.
Ducted air conditioning
It is the system that looks best in a renovated flat and the one that most constrains the project. It is decided before ceilings close, never after.
Cheap kitchens
The advertised price of a kitchen with fitting included is almost never the price you end up paying. Not because anyone is lying, but because “fitting” means a joiner’s day of work, not a renovation.
VAT on renovations
Two invoices for the same kitchen can differ by eleven percentage points of tax without a single thing about the work having changed. What decides the rate is the building, the buyer and the proportion of materials — never the contractor.
Other services
We also do
Clients
What clients say after their renovation
Rated 5.0 from 14 Google reviews. All real, from real projects.
★★★★★
“Doy un 10 la verdad con el servicio que me han prestado en una reforma de un piso en Barcelona capital, gente muy seria y responsable, gracias.”
Araks SahakyanJuly 2026
★★★★★
“Quedé encantada con la atención y la calidad del trabajo. Se nota que cuidan los detalles y cumplen con lo que prometen.”
Ana RiveraApril 2026
★★★★★
“Servicio muy profesional. Me explicaron todo con claridad y el trabajo quedó perfecto.”
Ana AlemanMarch 2026
★★★★★
“Si estas buscando profesionales responsables para hacer tu reforma, es el lugar indicado. Especializados en reformas integrales con la mejor atención personalizada. 100% recomendados.”
Daniel GarganoFebruary 2026
★★★★★
“Muy buen trabajo, ha realizado un trabajo muy profesional, ha cumplido en plazo y en calidad.”
Francisco PiñeirosAugust 2025
★★★★★
“Muy buenos profesionales, con excelente resultado.”
Esther DiezJune 2026
Want a figure for your own project?
Free site visit and a fixed written quote within 48 hours.
+34 615 78 93 41· Carrer de la Diputació, 189, Local 2 · 08011 Barcelona